|
|
| The eProcurement System of Chandigarh enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
| |
| |
| 1. Providing Rain Water Harvesting System in SCERT, Sector-32, U.T., Chandigarh. |
PH1/2026/478 |
30-Sep-2026 05:00 PM |
01-Oct-2026 11:20 AM |
| 2. Cleaning of SUMP/UGR Tanks of Block A, B, C, D, E, O (Sarai Building) and South Campus-48, Residential Complex-48 and Cleaning of Overhead PVC Tanks for South Campus-48 and GMCH, Sector - 32, Chandigarh. |
PH1/2026/479 |
30-Sep-2026 05:00 PM |
01-Oct-2026 11:25 AM |
| 3. REPAIR OF DAMAGED CPVC PIPES AND SPECIALS OF ALUM STORAGE TANKS, REPAIR OF AIR BLOWERS AND CHLORINE TOWERS OF FILTRATION PLANTS AT WATER WORKS SECTOR 39, CHANDIGARH. |
2026_MCPH1_150 |
03-Oct-2026 05:00 PM |
03-Oct-2026 05:30 PM |
| 4. REWIRING OF ELECTRICAL INSTALLATION AND REPLACEMENT OF EXISTING LIGHT FITTINGS, CEILING FANS AND DEFECTIVE SWITCHGEAR IN GOVT. MODEL HIGH SCHOOL VIKASNAGAR, MAULI JAGRAN, U.T., CHANDIGARH. |
E2/26/116 |
06-Oct-2026 12:00 PM |
06-Oct-2026 03:30 PM |
| 5. ANNUAL COMPREHENSIVE MAINTENANCE OF ORBIS MAKE 1 NO. 13 PASSENGER LIFT INSTALLED IN THE REGIONAL INSTITUTE OF ENGLISH, SECTOR-32, CHANDIGARH.(FOR THE PERIOD 2026-2027) |
E2/26/115 |
08-Oct-2026 12:00 PM |
08-Oct-2026 03:30 PM |
| 6. ANNUAL COMPREHENSIVE MAINTENANCE OF 3 NOS. ORBIS MAKE LIFTS INSTALLED IN GIRLS HOSTEL BLOCK AND POST GRADUATE GOVT. COLLEGE FOR GIRLS, SECTOR-42, CHANDIGARH. |
E2/26/114 |
08-Oct-2026 12:00 PM |
08-Oct-2026 03:30 PM |
| 7. Repair of Manhole, Cleaning of Drain, making new Manhole for Water Logging in Lift Shaft and other allied works in Group Home, Sector-31, U.T., Chandigarh |
PH1/2026/477 |
30-Sep-2026 05:00 PM |
01-Oct-2026 11:15 AM |
| 8. Providing Public Health Services for Renovation of Kitchen, Bath and Toilets at House No.1613 B (Type-III) under GMCH Residential Complex, Gate No.8, Sector-32, Chandigarh. |
PH1/2026/476 |
30-Sep-2026 05:00 PM |
01-Oct-2026 11:10 AM |
| 9. Special Repair which includes Providing and Laying of 6inch i/d, 8inch i/d PVC Pipeline and construction of Road Gullies and Manholes to dispose of Rain Water and Sewer in existing Manholes with all other related items in Govt. Model High School, Hal |
PH1/2026/475 |
30-Sep-2026 05:00 PM |
01-Oct-2026 11:00 AM |
| 10. ROOF TREATMENT OF BLOCK A, GOVT. SR. SEC. SCHOOL SECTOR-15, CHANDIGARH. |
CP3/2026/3140220 |
01-Oct-2026 11:00 AM |
01-Oct-2026 02:00 PM |
|
|
|
| |
 |
|
|
|
| |
|
|
|
|
|
| Search with ID/Title/Reference no |
|
|
|