|
|
| The eProcurement System of Chandigarh enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
| |
| |
| 1. Restoration of road cut regarding Renovation of 72 nos houses type II sector 41 UT Chandigarh (House No. 2001 to 2016, 2023 to 2030) |
MCC/R1/2026/156 |
28-Sep-2026 12:00 PM |
28-Sep-2026 12:00 PM |
| 2. Re-Construction of Damaged Footpath in EWS Colony Sector 38-C, Chandigarh (WDF) |
MCC/R1/2026/154 |
28-Sep-2026 12:00 PM |
28-Sep-2026 12:00 PM |
| 3. Re-Construction of Damaged Footpath after Raising Of Level on Back Side of Parsu Ram Bhawan in Sector 37-C, Chandigarh (WDF) |
MCC/R1/2026/153 |
28-Sep-2026 12:00 PM |
28-Sep-2026 12:00 PM |
| 4. Restoration of road cut regarding Renovation of 84 nos Houses Type-II, Sector- 41, U.T. Chandigarh (House No 2049 to 2195) |
MCC/R1/2026/155 |
28-Sep-2026 12:00 PM |
28-Sep-2026 12:00 PM |
| 5. Providing and laying of DI WS pipe line from booster to three story houses lane H No 3001 to 3016 Sec 31D Chd to overcome low water pressure problem and other allied works at Sec 31 Chd Capital Head Augmentation of WS in city Chd |
MCPH3/2026/361 |
28-Sep-2026 03:00 PM |
28-Sep-2026 03:30 PM |
| 6. Urgent repair of collapsed 66 inch Sewer brick drain near Golf Club Phase II Mohali under the jurisdiction of SDE MCPH Sub Divn No 12 Chandigarh Ch To Revenue Head |
MCPH3/2026/360 |
28-Sep-2026 03:00 PM |
28-Sep-2026 03:30 PM |
| 7. Repair and Mtc of PHS for various Non-Residential Building i.e. Schools, Dispensary and Sampark Centre under SDE W/s Sub Divn No. 11, Chandigarh (Ch. to 2215 Non Plan) |
PH7/2026/37 |
25-Sep-2026 11:00 AM |
25-Sep-2026 02:00 PM |
| 8. Renovation of House No. 611, Type XII, Sector 11, Chandigarh (IBM Scheme No. W4/2026/26450) |
PH7/2026/36 |
25-Sep-2026 11:00 AM |
25-Sep-2026 02:00 PM |
| 9. REPLACEMENT OF OLD/ DEFECTIVE EXISTING FITTINGS AND FANS WITH THE PROVIDING ADDITIONAL SECURITY LIGHT IN GOVT. MODEL SR. SEC. SCHOOL, SECTOR-16, CHANDIGARH. |
E1/TN-371 |
24-Sep-2026 12:00 PM |
24-Sep-2026 03:30 PM |
| 10. FIXING INSTALLATION CONNECTION TESTING AND COMMISSIONING OF 1 NO WATER COOLER AND RO WATER PURIFICATION SYSTEM INCLUDING CARRIAGE TO SITE OF WORK LOADING UNLOADING PLUMBING ELECTRICAL CONNECTION ETC COMPLETE IN ALL RESPECTS |
2026_MCPH1_146 |
25-Sep-2026 11:00 AM |
25-Sep-2026 11:00 AM |
|
|
|
| |
 |
|
|
|
| |
|
|
|
|
|
| Search with ID/Title/Reference no |
|
|
|