1. |
29-Dec-2023 03:00 PM |
19-Mar-2024 11:30 AM |
19-Mar-2024 03:30 PM |
[Recarpeting of Dispensaries of Sector 19 Sector 20 Sector 35 Chandigarh ]
[CP2Road1807-18][2023_CHD_72260_11]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - II
|
2. |
08-Feb-2024 06:00 PM |
19-Mar-2024 11:30 AM |
19-Mar-2024 03:30 PM |
[Speed Calming Measures at Sukhna Lake road Stretch ie Lake Turn on Uttar Marg and Sarovar Path ]
[CP2Road419-430][2024_CHD_79170_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - II
|
3. |
12-Mar-2024 06:00 PM |
19-Mar-2024 11:30 AM |
19-Mar-2024 03:30 PM |
[Providing and Fixing GI Barbed Wire Fencing with RCC Post 7 6 verge on vacant area of Sector 25 Sector 25W Sector 38 Sector 38B Sector 38 C Sector 39B Maloya Sarangpur falls under the jurisdiction of C12 Sub Division]
[CP2Road731-42][2024_CHD_80021_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - II
|
4. |
14-Mar-2024 12:00 PM |
19-Mar-2024 12:00 PM |
19-Mar-2024 03:30 PM |
[PROVIDING LED SCREEN BOARD WITH SUPPORTING STRUCTURE IN CIVIL HOSPITAL, SECTOR 22, CHANDIGARH.]
[E1/TN-531][2024_CHD_80045_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I
|
5. |
12-Mar-2024 12:30 PM |
19-Mar-2024 12:00 PM |
19-Mar-2024 12:00 PM |
[Raising/Repair and Reconstruction of existing footpath, around the park in front of H.No. 240,3827 and opposite H.No. 3001 to 3007 in Sector 32, Chandigarh ]
[2024/R2/20][2024_MCC_79533_3]
|
Municipal Corporation||Engineering-MCC||Road Division - III
|
6. |
12-Mar-2024 09:00 AM |
19-Mar-2024 12:00 PM |
19-Mar-2024 12:00 PM |
[ Supply, Installation, Testing, Commissioning and AMC of CCTV Cameras at EWS Colony, Dhanas, Chandigarh. ]
[2024_MCC_R3_015][2024_MCC_79523_2]
|
Municipal Corporation||Engineering-MCC||Road Division - II
|
7. |
13-Mar-2024 04:00 PM |
19-Mar-2024 12:00 PM |
19-Mar-2024 03:30 PM |
[MAINTENANCE OF ELECTRICAL INSTALLATION IN NON-RESIDENTIAL BUILDING AT CHANDIGARH. (ANNUAL COMPREHENSIVE MAINTENANCE OF FIRE ALARM SYSTEM AND PA SYSTEM IN 50 BEDDED CIVIL HOSPITAL SECTOR-45, CHANDIGARH)]
[E2/23/210][2024_CHD_80047_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II
|
8. |
14-Mar-2024 12:00 PM |
19-Mar-2024 12:00 PM |
19-Mar-2024 03:30 PM |
[RENOVATION OF VACANT HOUSE NO. 1734 (TYPE 11 JD), SECTOR 23, CHANDIGARH (IBM SCHEME NO.W4 2024 22959).]
[E1/TN-533][2024_CHD_80069_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I
|
9. |
12-Mar-2024 12:00 PM |
19-Mar-2024 12:00 PM |
19-Mar-2024 12:00 PM |
[PROVIDING AND FIXING 60MM THICK PAVER BLOCK PAVEMENT ON ALONG PHIRNI ROAD (BOTH SIDES) VILLAGE BEHLANA, CHANDIGARH]
[2024/R2/22][2024_MCC_79783_2]
|
Municipal Corporation||Engineering-MCC||Road Division - III
|
10. |
14-Mar-2024 12:20 PM |
19-Mar-2024 12:25 PM |
19-Mar-2024 03:30 PM |
[MTC. OF E.I IN RB AT CHANDIGARH (REPAIR MAINTENANCE OF ELECTRICAL INSTALLATION UNDER THE JURISDICTION OF SDE E 1, CHANDIGARH).]
[E1/TN-534][2024_CHD_80070_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I
|