1 |
05-Jul-2025 03:00 PM |
25-Jul-2025 06:00 PM |
29-Jul-2025 03:30 PM |
[RENOVATION OF TOILETS IN GIRLS HOSTEL, GGDSD College, Sector 32, Chandigarh]
[SDC/253][2025_CHD_87268_1]
|
Chandigarh Administration||GGDSD College Sector 32 |
2 |
05-Jul-2025 03:00 PM |
14-Jul-2025 12:00 PM |
14-Jul-2025 02:30 PM |
[RENOVATION/ UPGRADATION OF SPCA (SOCIETY FOR THE PREVENTION OF CRUELTY TO ANIMALS) BUILDING IN WEST OF SEC-38, CHANDIGARH. (PROVIDING AND INSTALLATION OF CCTVS CAMERAS).]
[E3/47W/67][2025_CHD_87271_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
3 |
05-Jul-2025 03:00 PM |
25-Jul-2025 06:00 PM |
28-Jul-2025 03:30 PM |
[RENOVATION OF TOILETS FOR DIFFERENTLY ABLED STUDENTS IN COLLEGE CAMPUS, GGDSD College, Sector 32, Chandigarh]
[SDC/254][2025_CHD_87270_1]
|
Chandigarh Administration||GGDSD College Sector 32 |
4 |
05-Jul-2025 12:00 PM |
11-Jul-2025 12:00 PM |
11-Jul-2025 02:30 PM |
[RENOVATION/ UPGRADATION OF SPCA (SOCIETY FOR THE PREVENTION OF CRUELTY TO ANIMALS) BUILDING IN WEST OF SEC-38, CHANDIGARH. (15 PASSENGER CUM STRETCHER LIFT WORK)]
[E3/47W/66][2025_CHD_87269_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
5 |
05-Jul-2025 12:00 PM |
16-Jul-2025 12:00 PM |
16-Jul-2025 03:30 PM |
[RENOVATION/ UPGRADATION OF SPCA (SOCIETY FOR THE PREVENTION OF CRUELTY TO ANIMALS) BUILDING IN WEST OF SEC 38, CHANDIGARH. (PROVIDING AND INSTALLATION OF MANUAL FIRE ALARM SYSTEM).]
[E3/47W/65][2025_CHD_87267_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
6 |
04-Jul-2025 06:55 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 01:30 PM |
[PROVIDING ELECTRICAL INSTALLATION IN SETTING UP EMERGENCY OPERATION CENTRE EOC IN SECTOR17, CHANDIGARH.]
[E1/TN-175][2025_CHD_87264_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
7 |
04-Jul-2025 06:00 PM |
11-Jul-2025 11:00 AM |
11-Jul-2025 12:00 PM |
[Renovation of House no.68 (Type 4) DM House Sector 7, Chandigarh. (Ch. to 4216 C.O. Accommodation for Govt. Employees)]
[PH3/2025/281][2025_CHD_87262_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
8 |
04-Jul-2025 06:00 PM |
11-Jul-2025 11:00 AM |
11-Jul-2025 03:00 PM |
[Waterproofing and renovation of Multipurpose Hall, PHS, Installation of AC 6 Nos, 2.0 TR, Capacity split type Air Conditioners and allied works at Auditorium of Govt. ITI for women Sector 11, Chandigarh.]
[PH7/2025/2189321][2025_CHD_87261_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
9 |
04-Jul-2025 06:00 PM |
11-Jul-2025 11:00 AM |
11-Jul-2025 03:00 PM |
[RENOVATION OF HOUSE NO. 197 TYPE 7 SECTOR 7 CHANDIGARH. ]
[CP3/2025/2189539 ][2025_CHD_87260_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
10 |
04-Jul-2025 06:00 PM |
11-Jul-2025 11:00 AM |
11-Jul-2025 03:00 PM |
[RENOVATION OF HOUSE NO. 537, 538 TYPE 12 SECTOR 7 CHANDIGARH. ]
[CP3/2025/2189539][2025_CHD_87259_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
11 |
04-Jul-2025 05:30 PM |
15-Jul-2025 12:00 PM |
15-Jul-2025 02:30 PM |
[Maintenance of street lighting on various roads in various sectors at Chandigarh. (Replacement of defunct LED street light and flood light fittings, pole wire, burn tout cable, casting of cement collar and other allied accessories on Daddu majra brid]
[E3/47W/64][2025_CHD_87258_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
12 |
04-Jul-2025 05:00 PM |
14-Jul-2025 12:00 PM |
14-Jul-2025 02:30 PM |
[Maintenance of street lighting on various roads in various sectors at Chandigarh. (Replacement of existing defunct LED driver, LED fittings, burnt out switchgear and other allied accessories on Marble road at UT Chandigarh).]
[E3/47W/63][2025_CHD_87256_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
13 |
04-Jul-2025 05:00 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 03:30 PM |
[SETTING UP OF P.A.O. CELL ON 6TH FLOOR AND GROUND FLOOR AT CHANDIGARH SECRETARIAT BUILDING, SECTOR-9-D, CHANDIGARH (E.I. WORK).]
[E2/25/48][2025_CHD_87257_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
14 |
04-Jul-2025 05:00 PM |
11-Jul-2025 11:00 AM |
11-Jul-2025 12:00 PM |
[Renovation of House no.56,1220,1291,1300 (Occupied House) (Type XII JD) Sector 23 Chandigarh (Total 04 Nos. Houses) (IBM Scheme No. W4/2025/24092)]
[PH3/2025/280][2025_CHD_87254_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
15 |
04-Jul-2025 04:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[RENOVATION OF STUDENTS FACILITIES IN POST GRADUATE GOVT. COLLEGE FOR GIRLS, SECTOR-42, CHANDIGARH. (E.I. WORK)]
[E2/25/47][2025_CHD_87250_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
16 |
04-Jul-2025 04:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 01:30 PM |
[MTC OF E.I IN RB AT CHANDIGARH (PROVIDING CEILINGS FANS IN HOUSE NO. 114, SECTOR 24, CHANDIGARH ALLOTTED TO HONBLE MR. JUSTICE DEEPAK MANCHANDA).]
[E1/TN-174][2025_CHD_87249_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
17 |
04-Jul-2025 02:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[MAINTENANCE OF E.I. IN NRB AT CHANDIGARH (AMC OF 02 NOS. DG SET 100 KVA AND 01 NO. 160 KVA DG SET INSTALLED IN DELUXE BUILDING, SECTOR 9, CHANDIGARH) (DURING THE YEAR 2025 2026).]
[E1/TN-172][2025_CHD_87243_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
18 |
04-Jul-2025 01:40 PM |
08-Jul-2025 05:00 PM |
09-Jul-2025 11:10 AM |
[Repair and Maintenance of Broken fittings/ fixtures in respect of Fire Fighting System and other allied works in Police Station of Manimajra, U.T., Chandigarh]
[ PH1/2025/244][2025_CHD_87247_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - I |
19 |
04-Jul-2025 01:30 PM |
08-Jul-2025 05:00 PM |
09-Jul-2025 11:00 AM |
[Providing and Fixing of all Sanitary Fittings and Fixtures in House No.3110 (Type-VI) for GMCH Complex Sector-48, Chandigarh ]
[PH1/2025/235][2025_CHD_87019_2]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - I |
20 |
04-Jul-2025 01:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 01:30 PM |
[MTC. OF E.I. IN GOVT. RB AT CHANDIGARH (REPLACEMENT OF DEFECTIVE ACCESSORIES IN CHANDIGARH ARMED POLICE COMPLEX DHANAS AT CHANDIGARH).]
[E1/TN-169][2025_CHD_87245_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
21 |
04-Jul-2025 12:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[MTC. OF E.I. IN RESIDENTIAL BUILDING AT CHANDIGARH (REPAIR REPLACEMENT OF DEFECTIVE SOUND CARD AND EPABX SYSTEM INSTALLED IN THE RESIDENCE OF CHIEF SECRETARY, SECTOR 7, UT, CHANDIGARH DURING THE YEAR 2025 26).]
[E1/TN-152][2025_CHD_87128_2]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
22 |
04-Jul-2025 12:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[MTC. OF E.I IN RB NRB AT CHANDIGARH (REWINDING OF CEILING FANS AND EXHAUST FAN UNDER MAINTENANCE BOOTH SECTOR 9, CHANDIGARH UNDER THE JURISDICTION OF SDE E 5, CHANDIGARH).]
[E1/TN-170][2025_CHD_87242_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
23 |
04-Jul-2025 11:30 AM |
09-Jul-2025 12:00 PM |
09-Jul-2025 03:30 PM |
[PROVIDING ADDITIONAL CCTV CAMERAS AT NEW DISTRICT COURT COMPLEX, SECTOR 43, CHANDIGARH (FOR SERVICE BLOCK ONLY).]
[E2/25/45][2025_CHD_87240_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
24 |
04-Jul-2025 10:10 AM |
11-Jul-2025 02:00 PM |
11-Jul-2025 03:00 PM |
[ANNUAL REPAIR FOR RESIDENTIAL BUILDING TYPES VIII, IX, XII, AND XIII AND VARIOUS POLICE HOUSES AT SECTOR 11, CHANDIGARH FOR THE YEAR 2025-26 UNDER THE CONTROL OF S.D.E. C-6, SECTOR 12, CHANDIGARH]
[CP1/2025/2168066][2025_CHD_87238_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - I |
25 |
03-Jul-2025 06:00 PM |
10-Jul-2025 02:00 PM |
10-Jul-2025 03:00 PM |
[ANNUAL REPAIR FOR RESIDENTIAL BUILDINGS (VARIOUS TYPES OF HOUSES EXCEPT TYPE I, II, III, IV, V) IN THE CAMPUS OF PEC (DEEMED TO BE UNIVERSITY), SECTOR 12, CHANDIGARH FOR THE YEAR 2025-26.]
[CP1/2025/2168088][2025_CHD_87236_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - I |
26 |
03-Jul-2025 06:00 PM |
09-Jul-2025 03:00 PM |
09-Jul-2025 03:30 PM |
[Providing placing and fixing of cut flower at the Raj Bhawan Punjab Sector 06 Chandigarh upto 31.03.2026 ]
[2158530][2025_CHD_87050_2]
|
Chandigarh Administration||Engineering||Construction Circle - II||Horticulture |
27 |
03-Jul-2025 05:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[MTC. OF E.I IN RB/NRB AT CHANDIGARH(PROVIDING SOUND SYSTEM ON HIRE BASIS FOR INAUGURATION OF VARIOUS SITES UNDER THE JURISDICTION OF SDEE 5, CHANDIGARH).]
[E1/TN-171][2025_CHD_87235_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
28 |
03-Jul-2025 04:00 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 01:30 PM |
[MTC. OF E.I. IN NON RESIDENTIAL BUILDING AT CHANDIGARH (REPAIR REPLACEMENT OF DEFECTIVE BURNOUT ELECTRICAL ACCESSORIES IN ADDITIONAL DELUXE BUILDING AND CHANDIGARH POLICE HEAD QUARTER SECTOR 9, CHANDIGARH).]
[E1/TN-168][2025_CHD_87231_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
29 |
03-Jul-2025 04:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[Mtc. of street lighting on various roads in various sectors at Chandigarh. (Replacement of defunct LED stret light, pole wire, burnt out cable, casting of cement collar and other allied accessories on slip road of junction no.54, Junction no.55, junc]
[E3/47W/60][2025_CHD_87229_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
30 |
03-Jul-2025 04:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[Maintenance of street lighting on various roads in various sectors at Chandigarh. (Replacement of existing defunct switchgear and burnt out cable on junction 52 Shanti Path road at UT Chandigarh).]
[E3/47W/61][2025_CHD_87230_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
31 |
03-Jul-2025 04:00 PM |
11-Jul-2025 12:00 PM |
11-Jul-2025 03:30 PM |
[ANNUAL COMPREHENSIVE MAINTENANCE OF 01 NO. SCHINDLER LIFT IN GOVT. REHABILITATION INSTITUTE FOR INTELLECTUAL DISABILITIES SECTOR-31, CHANDIGARH (FOR THE PERIOD 2025-2026).]
[E2/25/35][2025_CHD_86915_2]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
32 |
03-Jul-2025 04:00 PM |
11-Jul-2025 12:00 PM |
11-Jul-2025 03:30 PM |
[Providing renovation of Physiotherapy Lab and Dispensary in Post Graduate Govt. College (Co-ed)at sector-11, U.T. Chandigarh.]
[E3/47W/62][2025_CHD_87233_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
33 |
03-Jul-2025 03:00 PM |
09-Jul-2025 11:00 AM |
09-Jul-2025 03:00 PM |
[Providing and Fixing of Split Air Conditioners at Chess Coaching Centre and Yoga Hall, Sector 39, under mtc. Booth of Sector 38, U.T., Chandigarh.]
[PH7/2025/2186289][2025_CHD_87223_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
34 |
03-Jul-2025 03:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[RENOVATION OF SCO NO. 62-65, SECTOR 17 CHANDIGARH. ]
[CP3/2025/2186103][2025_CHD_87228_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
35 |
03-Jul-2025 03:00 PM |
10-Jul-2025 02:00 PM |
10-Jul-2025 03:00 PM |
[INSTALLATION OF MODULAR KITCHEN WITH ENHANCED STORAGE IN THE MAIN HOSTEL AND NEW, GIRLS HOSTEL OF POST GRADUATE GOVT. COLLEGE SECTOR 11, CHANDIGARH. ]
[CP1/2025/2130592][2025_CHD_87227_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - I |
36 |
03-Jul-2025 02:00 PM |
11-Jul-2025 11:00 AM |
11-Jul-2025 12:00 PM |
[Construction of additional toilet (Ground Floor) of House No. 229,273,294, 295,296,3872,3874,3915, 3933,3934 and vacant House No. 3803, 3806 and 3879 (Type X) Sector 22, Chandigarh (Total 13 Houses) (IBM Scheme No. W4/2025/24553) ]
[PH3/2025/279][2025_CHD_87226_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
37 |
03-Jul-2025 01:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[AR TO RB UNDER MAINTENANCE BOOTH SECTOR 7 CHANDIGARH (STEEL WORK)]
[CP3/2025/2184881 ][2025_CHD_87222_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
38 |
03-Jul-2025 01:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[REPAIR OF CHAJJAs REMOVAL OF TREES, ROOF TREATMENT OF TYPE XIII, XII, XI, IX AND VIII SECTOR 23 CHANDIGARH. ]
[CP3/2025/2184871 ][2025_CHD_87225_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
39 |
03-Jul-2025 01:00 PM |
09-Jul-2025 11:00 AM |
09-Jul-2025 12:00 PM |
[Renovation of House no.2214,2215,2217 to 2220, 2222 to 2232, 2235 to 2238, 2048, 2137, 2429 (Occupied House)(Type XIII) Sector 23 Chandigarh (Total 24 Nos. Houses) (IBM Scheme No. W4/2025/24139)]
[PH3/2025/278][2025_CHD_87218_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
40 |
03-Jul-2025 01:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[AR AND SR TO RB TYPE VI HOUSES SECTOR 24 CHANDIGARH. ]
[CP3/2025/2184871][2025_CHD_87224_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
41 |
03-Jul-2025 01:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[SR TO RB UNDER MAINTENANCE BOOTH SECTOR 7 CHANDIGARH. ]
[CP3/2025/2184881 ][2025_CHD_87221_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
42 |
03-Jul-2025 12:30 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[AR TO RB TYPE 6 SECTOR 7 CHANDIGARH (WOOD WORK)]
[CP3/2025/2184881 ][2025_CHD_87220_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
43 |
03-Jul-2025 12:30 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 12:00 PM |
[Renovation of House no.476 (Type X JD) Sector 22, Chandigarh (IBM Scheme No. W4/2025/24629) ]
[PH3/2025/277][2025_CHD_87216_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
44 |
03-Jul-2025 12:30 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[RENOVATION OF VACANT HOUSE NO. 118 (TYPE 8) (01 NOS. HOUSES) SECTOR 23 CHANDIGARH. ]
[CP3/2025/2184877 ][2025_CHD_87219_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
45 |
03-Jul-2025 12:00 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 03:30 PM |
[MTC OF EI IN GOVT. NRB AT CHANDIGARH. (AMC OF GENERATING SET 180 KVA IN SNEHALAYA BUILDING, MALOYA, CHANDIGARH). (FOR THE YEAR 2025-26) (12 MONTHS) ]
[E3/47W/59][2025_CHD_87214_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
46 |
03-Jul-2025 12:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[HOUSE NO. 138 (TYPE VI) SECTOR 24 CHANDIGARH (PROVISION OF GAZEBO IN REAR LAWN)]
[CP3/2025/2184877 ][2025_CHD_87217_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
47 |
03-Jul-2025 12:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 03:00 PM |
[RENOVATION OF VACANT HOUSE NO. 1316A, 1431A, 1511, 2621 AND OCCUPIED HOUSE NO. 1534 TYPE 12 (OLD) (05 NOS. HOUSES) SECTOR 20 CHANDIGARH. ]
[CP3/2025/2184877][2025_CHD_87215_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
48 |
03-Jul-2025 11:30 AM |
09-Jul-2025 11:00 AM |
09-Jul-2025 12:00 PM |
[Repair and mtc. of Road gully and Storm Lines at various areas under SDE W/S Sub Division No. 2 Chandigarh. (Ch. to 2215 NRB) ]
[PH3/2025/276][2025_CHD_87210_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
49 |
02-Jul-2025 06:55 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[AUGMENTATION OF 3 NOS. EXISTING 10 PASSENGER LIFTS KONE MAKE HAVING ACCESS TO ALL THE FLOORS I.E. PARKING LEVEL TO LEVEL IV OF EXTENSION BLOCK BUILDING AT GATE NO.6 IN THE PUNJAB AND HARYANA HIGH COURT, SECTOR 1, CHANDIGARH.]
[E3/47W/58][2025_CHD_87211_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
50 |
02-Jul-2025 06:25 PM |
15-Jul-2025 03:00 PM |
15-Jul-2025 03:30 PM |
[ROOF TREATMENT WORK IN ADMINISTRATIVE BLOCK IN THE MODEL JAIL SECTOR 51, UT. ,CHANDIGARH]
[CP6/2025/2150-62/roof][2025_CHD_87212_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - VI |
51 |
02-Jul-2025 06:00 PM |
15-Jul-2025 03:00 PM |
15-Jul-2025 03:30 PM |
[VARIOUS NEED BASED REPAIR WORKS AT GOVERNMENT MODEL HIGH SCHOOL, VIKAS NAGAR MAULIJAGRAN, CHANDIGARH]
[CP6/2025/2163-75/schoolmauli][2025_CHD_87209_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - VI |
52 |
02-Jul-2025 04:00 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[PROVIDING AMC OF 250 KVA DG SET INSTALLED IN 50 BEDDED HOSPITAL, SECTOR-45, CHANDIGARH (FOR THE YEAR 2025-2026).]
[E2/25/44][2025_CHD_87206_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
53 |
02-Jul-2025 04:00 PM |
09-Jul-2025 05:00 PM |
10-Jul-2025 11:10 AM |
[Providing and Fixing of Fire Fighting System in Asha Kiran, Sector-46, Chandigarh.]
[PH1/2025/243][2025_CHD_87208_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - I |
54 |
02-Jul-2025 03:45 PM |
09-Jul-2025 05:00 PM |
10-Jul-2025 11:00 AM |
[Providing and Fixing of D.G. Set Silent Type with AMF Panel and other allied works contingent thereto for Block C, Medical Gas Plant GMCH Sector-32, Chandigarh.]
[PH1/2025/242][2025_CHD_87207_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - I |
55 |
02-Jul-2025 03:30 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[ANNUAL COMPREHENSIVE MAINTENANCE OF 500 KVA DG SETS INSTALLED FOR VARIOUS BLOCKS OF GMCH, SECTOR-32, CHANDIGARH (FOR THE PERIOD 2025-2026). ]
[E2/25/43][2025_CHD_87205_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
56 |
02-Jul-2025 02:00 PM |
11-Jul-2025 11:00 AM |
11-Jul-2025 12:00 PM |
[Boring and installing of 1 No. New Deep bore tubewell 12 inchesx 8 inches (304.80 mm x 203.20mm) id with reverse rotary rig method for irrigation water in lieu of tubewell at Part-10 Village Kaimbwala UT Chandigarh ]
[PH3/2025/275][2025_CHD_87202_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
57 |
02-Jul-2025 02:00 PM |
09-Jul-2025 11:00 AM |
09-Jul-2025 03:00 PM |
[Providing and Installation of 2.0 and 1.5 TR Capacity Split Type Air Conditioners at various rooms of CTU work shop Depot No.III, Sector 25, Chandigarh.]
[PH7/2025/2182057][2025_CHD_87204_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
58 |
02-Jul-2025 02:00 PM |
09-Jul-2025 11:00 AM |
09-Jul-2025 03:00 PM |
[Providing Rain Water Harvesting System (Rain Water Utilization) in veterinary Dispensary of Palsora and Maloya (Total02 No.) U.T., Chandigarh.]
[PH7/2025/2182080][2025_CHD_87203_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
59 |
02-Jul-2025 01:00 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 01:30 PM |
[MTC. OF E.I. IN RESIDENTIAL BUILDING AT CHANDIGARH (REPLACEMENT OF DEFECTIVE FITTINGS AND ACCESSORIES IN JUDGES HOUSE, TYPE VIII AND ABOVE HOUSES UNDER MTC. BOOTH, SECTOR 7, CHANDIGARH).]
[E1/TN-167][2025_CHD_87201_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
60 |
02-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
08-Jul-2025 01:30 PM |
[RENOVATION OF HOUSE NO. 2325 (TYPE II) SECTOR 19, CHANDIGARH (TOTAL 01 NO. HOUSE) (IBM SCHEME NO. W4 2025 24429).]
[E1/TN-165][2025_CHD_87194_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
61 |
02-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:30 PM |
[Maintenance of street lighting on various roads in various sectors at Chandigarh. (Providing earhting and other allied accessories for high mast and street light on Dhanas colony and other various roads at UT Chandigarh).]
[E3/47W/57][2025_CHD_87196_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
62 |
01-Jul-2025 06:15 PM |
08-Jul-2025 02:00 PM |
08-Jul-2025 03:00 PM |
[H. NO.1018 (TYPE 8 FM), SECTOR 11-B, CHANDIGARH - CONVERSION OF GARAGE INTO CAMP OFFICE THEREIN. ]
[CP1/2025/2166423][2025_CHD_87195_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - I |
63 |
01-Jul-2025 06:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 02:00 PM |
[S/R for R/B 16 Nos Type IV Houses( H. No. 2697 to 2698, 2702, 2697/A to 2702/A, 2697/B to 2702/B and Type V 04 nos ( H. No. 2185 to 2188) in Sector 42, Chandigarh for the Year 2024-2025]
[CP4/2025/2179772][2025_CHD_87174_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - IV |
64 |
01-Jul-2025 06:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 02:00 PM |
[A/R for N/R/B for Labour Welfare Centre in Sector-30, Chandigarh for the Financial Year 2025-2026]
[CP4/2025/2179772][2025_CHD_87176_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - IV |
65 |
01-Jul-2025 06:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 02:00 PM |
[S/R for R/B 72 Nos Type-II Houses (H. No.2775 to 2786, 2787 to 2798 Sector-42, Chandigarh for the Financial Year 2024-2025.]
[CP4/2025/2179772][2025_CHD_87175_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - IV |
66 |
01-Jul-2025 06:00 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 03:30 PM |
[MTC OF EI IN GOVT. NRB AT CHANDIGARH. (AMC OF GENERATING SET 62.5 KVA IN RHTC SECTOR-56, CHANDIGARH). (FOR THE YEAR 2025-26) (12 MONTHS) ]
[E3/47W/56][2025_CHD_87192_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
67 |
01-Jul-2025 06:00 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:00 PM |
[Providing Rain Water Harvesting System at Corbu Hostel and Mess of CCA College, Sector 12, Chandigarh.]
[PH7/2025/2179149][2025_CHD_87190_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
68 |
01-Jul-2025 06:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 02:00 PM |
[S/R for N/R/B Sports Complex in Sector-39, Chandigarh for the Financial Year 2025-2026]
[CP4/2025/2179772][2025_CHD_87173_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - IV |
69 |
01-Jul-2025 06:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 02:00 PM |
[Providing Kota Stone and Tile Flooring in Govt. Model High School, Sector-29B, Chandigarh]
[CP4/2025/2179780][2025_CHD_87177_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - IV |
70 |
01-Jul-2025 05:30 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
[Repair, maintenance and replacement of damaged Public Health Fixtures and other allied works in House No. 137 (Type 7) Sector 24 under mtc. booth Sector 16 Chandigarh. (Ch. to 2216 (N.P) Mtc. and repair) ]
[PH3/2025/274][2025_CHD_87191_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
71 |
01-Jul-2025 05:30 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 01:30 PM |
[MTC. OF E.I. IN GOVT. NRB AT CHANDIGARH (REPLACEMENT OF OLD DEFECTIVE LED FITTING IN POLICE STATION, MANIMAJRA, CHANDIGARH]
[E1/TN-166][2025_CHD_87193_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
72 |
01-Jul-2025 05:10 PM |
08-Jul-2025 02:00 PM |
08-Jul-2025 03:00 PM |
[ROOF ON EXISTING RAMP AND INCREASING RAILING HEIGHT ON PARAPET AT GOVT. HIGH SCHOOL IN PGIMER, SECTOR 12, CHANDIGARH (NRB) ]
[CP1/2025/2161823][2025_CHD_87189_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - I |
73 |
01-Jul-2025 05:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
[Repair and Maintenance of various road Gullies, Tertiary Treated Water Line detection the leakage and other allied work at Chandigarh Armed Police Complex, Dhanas, U.T., Chandigarh. ]
[PH8/2025/2181914/103][2025_CHD_87186_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VIII |
74 |
01-Jul-2025 05:00 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[COMPREHENSIVE ANNUAL MAINTENANCE OF X-RAY BAGGAGE SCANNER AND TURNSTILE GATES WITH IP BASED CONTROLLERS INSTALLED AT PUNJAB AND HARYANA HIGH COURT, SECTOR 1, CHANDIGARH. (MTC. OF E.I. IN NRB AT CHANDIGARH)]
[E3/47W/55][2025_CHD_87184_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
75 |
01-Jul-2025 05:00 PM |
14-Jul-2025 06:55 PM |
15-Jul-2025 11:00 AM |
[Tender for award of Contract for MESS and Canteen of Hostels]
[PGGC11CHD-HOSTEL-2025-001][2025_CHD_87180_1]
|
Chandigarh Administration||PG Govt. College - 11 |
76 |
01-Jul-2025 05:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
[Operation, running and preventive mtc. of Centralized AC Plant of 2400 TR capacity and 400 TR capacity of AC plant near museum, Ventilation System of Multilevel Car Parking at Punjab and Haryana High Court, Chd for the period of 01.08.25 to 15.12.25]
[PH8/2025/2181905/104][2025_CHD_87187_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VIII |
77 |
01-Jul-2025 04:30 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
[Repair / Rectification under Ground Leakage of the DI / CI Pipes in the Police Line Sector-26, Chandigarh. ]
[PH8/2025/2181951/102][2025_CHD_87185_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VIII |
78 |
01-Jul-2025 04:15 PM |
22-Jul-2025 02:00 PM |
22-Jul-2025 03:00 PM |
[CONSTRUCTION OF ROAD (VIKAS MARG) IN BETWEEN BULK MATERIAL MARKET, SECTOR 56 (WEST) AND 2ND GRAIN, FRUIT AND VEGETABLE MARKET, SECTOR 39 (WEST), CHANDIGARH. ]
[CP1/2025/2131038][2025_CHD_87179_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - I |
79 |
01-Jul-2025 04:00 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[Mtc of E.I. in various NRB at Chandigarh. (Repair/ replacement of security lights and miscellaneous items in Police Station Sec-39 and Police Post Maloya, UT Chandigarh under the jurisdiction of SDE E-7, Chd.) ]
[E3/47W/54][2025_CHD_87181_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
80 |
01-Jul-2025 04:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
[Running Preventive Maintenance of Public Health Services of various Non Residential Buildings under Mtc. Booth Sector-35 under the jurisdiction of SDE W/s Sub Division No.1, Chandigarh. ]
[PH8/2025/2181930/101][2025_CHD_87183_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VIII |
81 |
30-Jun-2025 06:45 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 03:00 PM |
[Providing Rain Water Harvesting System in CTU Depot No. III in Sector 25, under SDE W/s Sub Division No. 11, Chandigarh]
[PH7/2025/2176505][2025_CHD_87138_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
82 |
30-Jun-2025 06:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
[Renovation of allotted House No. 529,554, 564,569,573,575,577, 644,3265,3299,3305, 3314,3399 and 3574 (Type XIII) Sector 22 Chandigarh (Total 14 Nos. House) (IBM Scheme No. W4/2025/24631)]
[PH3/2025/273][2025_CHD_87171_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
83 |
30-Jun-2025 06:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
[Additional construction in various Judge Houses Nos. 3401, 3408,3410,3411 ]
[PH3/2025/272][2025_CHD_87170_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
84 |
30-Jun-2025 05:30 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 01:30 PM |
[MTC. OF E.I. IN NRB AT CHANDIGARH (PROVIDING EXHAUST PIPE AND REPAIR OF THE RADIATOR OF 160 KVA DG INSTALLED AT DELUXE BUILDING, SECTOR 9, CHANDIGARH)]
[E1/TN-162][2025_CHD_87168_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
85 |
30-Jun-2025 05:00 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[PROVIDING 10 KVA UPS IN THE OFFICE OF AMM (AYUSH), SECTOR 24 B, CHANDIGARH.]
[E1/TN-469][2025_CHD_85077_2]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
86 |
30-Jun-2025 05:00 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
[Repair and Maintenance electrical component and day to day routine Mtc. at Hockey Stadium Sector-42, Chandigarh.]
[PH8/2025/2179244/100][2025_CHD_87163_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VIII |
87 |
30-Jun-2025 05:00 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
[Providing and Installation of 4 nos. split type of Air Conditioners of 2.0 TR Capacity in Gymnasium Hall at Model Jail Sector-51, U.T, Chandigarh.]
[PH8/2025/2144873/88][2025_CHD_86715_2]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VIII |
88 |
30-Jun-2025 05:00 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[DE SILTING OF DRIED-UP AREA BACKSIDE SUKHNA LAKE REGULATOR END, CHANDIGARH (PROVIDING CCTV SCREEN AND UPS AT FLOOD CONTROL ROOM REGULATOR END SUKHNA LAKE, CHANDIGARH UNDER THE JURISDICTION OF SDE E 5, CHANDIGARH) (IBM SCHEME NO.W3 2025 24671)]
[E1/TN-163][2025_CHD_87166_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
89 |
30-Jun-2025 04:00 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 03:00 PM |
[RENOVATION OF VACANT HOUSE NO. 1142A, 1148A, 1149A, 1153, 1158, 1477A AND 1178A (TYPE 13) (07 NO. HOUSES) SECTOR 19 CHANDIGARH]
[CP3/2025/2176602][2025_CHD_87164_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - III |
90 |
30-Jun-2025 04:00 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:30 PM |
[RENOVATION/ UPGRADATION OF SPCA (SOCIETY FOR THE PREVENTION OF CRUELTY TO ANIMALS) BUILDING IN WEST OF SEC 38, CHANDIGARH. (E.I. WORK)]
[E3/47W/53][2025_CHD_87165_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
91 |
30-Jun-2025 04:00 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:30 PM |
[PROVIDING RFID CARDS ALONGWITH ACCESSORIES IN PUNJAB AND HARYANA HIGH COURT, SECTOR 1, CHANDIGARH. (MTC. OF E.I. IN NRB AT CHANDIGARH).]
[E3/47W/52][2025_CHD_87162_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
92 |
30-Jun-2025 02:00 PM |
10-Jul-2025 12:30 PM |
11-Jul-2025 03:30 PM |
[Recarpeting of Internal Road inside Kothi No 46 Sector 2 UT Chandigarh]
[CP2Road1808949][2024_CHD_83260_3]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - II |
93 |
30-Jun-2025 02:00 PM |
10-Jul-2025 12:30 PM |
11-Jul-2025 03:30 PM |
[Restoration of the Road cut at Maulijagran Chandigarh]
[CP2Road2133463][2025_CHD_86539_3]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - II |
94 |
30-Jun-2025 01:00 PM |
10-Jul-2025 11:30 AM |
11-Jul-2025 03:30 PM |
[Recarpeting of Entrance and Internal Road and Providing and Fixing of Paver Block in General Hostel Sector 15 UT Chandigarh]
[CP2Road2171731][2025_CHD_87161_1]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - II |
95 |
28-Jun-2025 09:00 AM |
07-Jul-2025 11:00 AM |
07-Jul-2025 02:00 PM |
[Renovation/Up-gradation of SPCA Building at Sector-38 West, Chandigarh]
[CP4/2025/2178413][2025_CHD_87159_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - IV |
96 |
28-Jun-2025 09:00 AM |
25-Aug-2025 11:00 AM |
25-Aug-2025 11:30 AM |
[Design, supply, installation and commissioning of open standard digital trunking Radio system for chandigarh Police]
[20450-51/UT/P-4][2025_CHD_87116_1]
|
Chandigarh Administration||Chandigarh Police |
97 |
27-Jun-2025 06:30 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:30 PM |
[MTC. OF 55 NOS. ATC SIGNALS, 54 NOS. BLINKERS AND 14 NOS. PELICAN TRAFFIC SIGNALS (R.R. MAKE CONTROLLERS) INSTALLED IN VARIOUS JUNCTIONS AT VARIOUS SECTORS AT CHANDIGARH. (FOR 12 MONTHS 2025-26).]
[E1/TN-161][2025_CHD_87148_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
98 |
27-Jun-2025 06:00 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
[Renovation of House No. 1065,1108, 1547, 1550,1567,1616 (Occupied Houses) (Type XII JB) Sector 23, Chandigarh (Total 06 Nos. Houses) (IBM Scheme No. W4/2025/24599)]
[PH3/2025/268][2025_CHD_87155_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
99 |
27-Jun-2025 06:00 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 01:30 PM |
[MTC OF VARIOUS CYCLE TRACK ROADS ON VARIOUS SECTORS AT CHANDIGARH MADHYA MARG, UDYAN PATH V3 ROAD, VIDHYA PATH, UNDER THE JURISDICTION OF ELECTRICAL SUB DIVISION NO. 11 U.T. CHANDIGARH).]
[E1/TN-164][2025_CHD_87154_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
100 |
27-Jun-2025 06:00 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 12:00 PM |
[Cleaning of existing road gullies, manholes and allied system for proper Storm Water Drainage at various Non Residential Building under mtc. booth Sector 19 U.T., Chandigarh (period for 03 months) (Ch. to 2215 (N.P) NRB) ]
[PH3/2025/265][2025_CHD_87151_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
101 |
27-Jun-2025 06:00 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
[Renovation of Vacant House No. 2080A, 2087A, 2104A, 2153A, 2154A, 2260A, 2282A, 2295A, 2454A, 2473, 2481A, 2551A, 2565A, 2570A, 2577, 2578A, 2582A, 2583A, 2595A, 2602A, 2604A, 2611A, 2494A (Type XIII) Sector 24 Chandigarh (Total 23 Nos. Houses) (IBM ]
[PH3/2025/270][2025_CHD_87157_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
102 |
27-Jun-2025 06:00 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
[Roof Treatment of House No. 56,254, 1316(Occupied House) (Type XII JD) Sector 23 Chandigarh (03 Nos. Houses) (IBM Scheme No. W4/2025/24280)]
[PH3/2025/269][2025_CHD_87156_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
103 |
27-Jun-2025 04:00 PM |
14-Jul-2025 12:00 PM |
14-Jul-2025 03:30 PM |
[ MTC. Of E.I. IN NON RESIDENTIAL BUILDING AT CHANDIGARH (PROVIDING REPAIR OF 2 NOS. 8 PASSENGER LIFT OF JOHNSON MAKE INSTALLED AT TRANSIT FLATS SECTOR 19, CHANDIGARH (1401 TO 1408 ABC AND 1409 TO 1416 ABC ) (DURING THE YEAR 2025 2026).]
[E1/TN-55][2025_CHD_86162_2]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
104 |
26-Jun-2025 05:30 PM |
09-Jul-2025 11:00 AM |
09-Jul-2025 12:00 PM |
[Cleaning of existing road gullies, manholes and allied system for proper Storm Water Drainage from Rock Garden, Lake Sports Club and Jogging Track U.T., Chandigarh (Period for 3 months) (Ch. to 2215 NP) NRB)]
[PH3/2025/263][2025_CHD_87105_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
105 |
26-Jun-2025 05:00 PM |
08-Jul-2025 11:00 AM |
08-Jul-2025 12:00 PM |
[Providing and fixing of 2.0 TR and 1.5 TR capacity Split Type Air Conditioners in the O/o AERO-01 Situated at Bal Bhawan, Sector 23, Chandigarh]
[PH3/2025/261][2025_CHD_87101_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
106 |
26-Jun-2025 05:00 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:30 PM |
[ANNUAL MTC. OF 1 NO. LIFT OF THYSSENKRUPP MAKE IN PUNJAB AND HARYANA CIVIL SECRETARIAT BUILDING, SECTOR 1, CHANDIGARH. (LIFT NO.5)(FOR THE YEAR 2025-26).]
[E3/47W/49][2025_CHD_87097_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
107 |
26-Jun-2025 01:00 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 12:00 PM |
[Annual operation and comprehensive Maintenance of VRV System 76 HP AC Plant installed at CTU Complex Industrial Area Phase I, Chandigarh. (Ch. to 2215 N.P. (P) NRB]
[PH3/2025/257][2025_CHD_87071_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
108 |
26-Jun-2025 12:00 PM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[PROVISION OF 1 NO. 13 PASSENGER LIFT IN SARAI BUILDING, GMSH, SECTOR 16, CHANDIGARH.]
[E1/TN-69][2025_CHD_86247_2]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
109 |
26-Jun-2025 11:45 AM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[REPLACEMENT OF 1 NO. 5 PASSENGER ELECTRIC LIFT FOR HONBLE JUDGES ENTRY IN HIGH COURT EXTENSION BUILDING, BLOCK C, ECTOR 17, CHANDIGARH.]
[E1/TN-68][2025_CHD_86245_2]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
110 |
26-Jun-2025 10:00 AM |
07-Jul-2025 10:00 AM |
07-Jul-2025 12:00 PM |
[Environmental Clearance and Eco-sensitive clearance]
[Estate-26/06/2025][2025_CHD_87070_1]
|
Chandigarh Administration||Estate Office |
111 |
25-Jun-2025 05:30 PM |
07-Jul-2025 11:00 AM |
07-Jul-2025 03:00 PM |
[Providing and Installation of 1.5 and 2.0 TR Capacity Split Type AC at HWC- Maloya, Chandigarh.]
[PH7/2025/2174285][2025_CHD_87076_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
112 |
25-Jun-2025 12:30 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[ANNUAL COMPREHENSIVE MAINTENANCE OF 5 NOS. LIFTS OF JOHNSON MAKE LIFTS INSTALLED IN MENTAL HEALTH INSTITUTE, SECTOR-32, CHANDIGARH]
[E2/25/37][2025_CHD_87061_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
113 |
25-Jun-2025 12:00 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 03:30 PM |
[ANNUAL COMPREHENSIVE FORTNIGHTLY MAINTENANCE OF 3 NOS. JOHNSON MAKE LIFTS IN 100 BEDDED HOSPITAL, SECTOR-48, CHANDIGARH ]
[E2/25/40][2025_CHD_87058_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
114 |
24-Jun-2025 05:00 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:00 PM |
[ Providing installing Testing and Commissioning of all-weather Swimming Pool Heating System in the Sports Complex Sector-39, Chandigarh including operation for five years and comprehensive maintenance cost of three years after defect liability period]
[PH7/2025/2124038][2025_CHD_86386_3]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - VII |
115 |
24-Jun-2025 05:00 PM |
08-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
[Recarpeting of Sector 22 23 35 36 Roundabout Jn33 with Mastic Asphalt Chandigarh]
[CP2Road2132105][2025_CHD_86534_2]
|
Chandigarh Administration||Engineering||Construction Circle - II||CP - II |
116 |
24-Jun-2025 12:30 PM |
14-Jul-2025 12:00 PM |
14-Jul-2025 03:30 PM |
[CONSTRUCTION OF NEW HOSTELS FOR MBBS (BOYS AND GIRLS) IN GMCH - RESIDENTIAL CAMPUS, SECTOR-48, CHANDIGARH (PROVIDING 4 NOS. LIFTS).]
[E2/25/41][2025_CHD_87035_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - II |
117 |
20-Jun-2025 06:30 PM |
10-Jul-2025 11:00 AM |
10-Jul-2025 12:00 PM |
[Cleaning of existing road gullies, manholes and allied system for proper Storm Water Drainage from High Court Chowk to Kissan Bhawan Chowk and other areas U.T., Chandigarh (period fro 03 months) (Ch. to 2215 (N.P) Urban Water Supply)]
[PH3/2025/253][2025_CHD_86992_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III |
118 |
20-Jun-2025 10:00 AM |
11-Jul-2025 03:00 PM |
15-Jul-2025 12:00 PM |
[E-TENDER FOR THE PURCHASE OF EQUIPMENT FOR BAKERY UNIT OF MODEL JAIL, CHANDIGARH]
[6233/UT/SJ, CHD][2025_CHD_86810_1]
|
Chandigarh Administration||Prisons |
119 |
18-Jun-2025 11:20 AM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[ANNUAL MAINTENANCE OF 1 NO. LIFT OF SCHINDLER MAKE LIFT INSTALLED IN PANCHAYAT BHAWAN, SECTOR 18, CHANDIGARH. (FOR THE YEAR 2025 26).]
[E1/TN-472][2025_CHD_85105_3]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
120 |
16-Jun-2025 12:25 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 03:30 PM |
[MTC OF E.I IN NRB AT CHANDIGARH. (ANNUAL MAINTENANCE OF 02 NOS. VVIP GATE SIDE LIFT OF THYSSENKRUPP MAKE INSTALLED IN U.T., OLD SECRETARIATE BUILDING, SECTOR 9, CHANDIGARH. (FOR THE PERIOD 2025 2026).]
[E1/TN-133][2025_CHD_86883_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
121 |
16-Jun-2025 12:15 PM |
09-Jul-2025 12:00 PM |
09-Jul-2025 03:30 PM |
[MTC OF E.I IN NRB AT CHANDIGARH. (ANNUAL MAINTENANCE OF 01 NO. 13 PASSENGER THYSSENKRUPP MAKE LIFT INSTALLED IN U.T., OLD SECRETARIATE BUILDING, SECTOR 9, CHANDIGARH. (FOR THE PERIOD 2025 2026).]
[E1/TN-132][2025_CHD_86882_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
122 |
13-Jun-2025 05:00 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:30 PM |
[Maintenance of street lighting on various roads in various sectors at Chandigarh. (Replacement of existing defunct LED street light fittings, burnt out cable, switchgear and other allied accessories from Dhanas to Togan Road at UT Chandigarh.)]
[E3/47W/39][2025_CHD_86861_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - III |
123 |
12-Jun-2025 02:00 PM |
07-Jul-2025 12:00 PM |
07-Jul-2025 03:30 PM |
[ANNUAL MTC. OF JOHNSON MAKE INSTALLED AT 216 NOS. TYPE-II HOUSES (PART II) IN CHANDIGARH ARMED POLICE COMPLEX, DHANAS, U.T, CHANDIGARH (09 NOS. 10 PASSENGER LIFTS) (FOR THE PERIOD 2025 2026).]
[E1/TN-122][2025_CHD_86826_1]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
124 |
12-Jun-2025 11:25 AM |
10-Jul-2025 12:00 PM |
10-Jul-2025 03:30 PM |
[ANNUAL MAINTENANCE OF UT LIMITED MAKE HYDRAULIC LIFTS INSTALLED AT HOUSE NO 35 SECTOR 4 HON BLE CHIEF JUSTICE RESIDENCE CHANDIGARH (FOR THE PERIOD 2025 2026]
[E1/TN-74][2025_CHD_86283_2]
|
Chandigarh Administration||Engineering||Electrical Circle||Electrical Div - I |
125 |
03-Jun-2025 06:00 PM |
14-Jul-2025 03:30 PM |
14-Jul-2025 03:30 PM |
[RFP for providing consultancy services for Development of Sports Complex Sector42-A, Chandigarh with Construction of Indoor Multipurpose Sports Hall, Swimming Pool and Girls Hostel including planning, designing, etc. of all civil, public health, elec]
[CP4/2025/2137517][2025_CHD_86605_1]
|
Chandigarh Administration||Engineering||Construction Circle - I||CP - IV |