1. |
29-Jun-2022 04:00 PM |
06-Jul-2022 11:00 AM |
06-Jul-2022 12:00 PM |
[Providing Additional Road Gullies , Upgradation of Road Gullies and other allied works on High Court Chowk to Kissan Bhawan Chowk Sector-35, U.T. Chandigarh. (Ch to 2215 (N.P.) Urban Water Supply )]
[ph3/2022/132][2022_CHD_66285_4]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III
|
2. |
29-Jun-2022 12:00 PM |
06-Jul-2022 11:00 AM |
06-Jul-2022 12:00 PM |
[Renovation of toilet at Govt. Model High School Sector-7, U.T., Chandigarh.]
[ph3/2022/154][2022_CHD_66687_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III
|
3. |
29-Jun-2022 03:00 PM |
06-Jul-2022 11:00 AM |
06-Jul-2022 12:00 PM |
[Renovation of House No.2662,Type-XII, Sector 19-C, Chandigarh.]
[ph3/2022/155][2022_CHD_66702_1]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III
|
4. |
29-Jun-2022 04:00 PM |
06-Jul-2022 11:00 AM |
06-Jul-2022 12:00 PM |
[Supplying and mixing of Chemical for disinfection of water for Swimming Pools at Sector-8, Chandigarh (01.06.2022 to 31.10.2022 ) (Ch to Annual mtc. of Swimming Pool Sector-8, Chandigarh )]
[ph3/2022/119][2022_CHD_66087_5]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III
|
5. |
08-Jun-2022 11:30 AM |
06-Jul-2022 11:00 AM |
06-Jul-2022 03:00 PM |
[Strengthen the distribution system after replacement and augmentation of 11 KV U/G pilca 3x185/120/70 sq. mm link or feeder cable with 3x300 sq. mm XLPE cable in Sector 9 and 10 under Electy. OP Sub Divn. No. 2, U.T. Chd]
[OP-1/15/2022-23][2022_CHD_66323_1]
|
Chandigarh Administration||Engineering||Electricity Circle||Electricity Div - I
|
6. |
29-Jun-2022 04:00 PM |
06-Jul-2022 11:00 AM |
06-Jul-2022 12:00 PM |
[maintenance including servicing and repair of Air Conditioners (Window, Split, Pillar type ) installed and other allied work in Art College sector 10, Musem and Art Gallery sector 10,Camp Offices and other buildings (under mtc. booth Sec-16, Chandig]
[ph3/2022/110][2022_CHD_65982_3]
|
Chandigarh Administration||Engineering||Public Health Circle||PH Div - III
|
7. |
29-Jun-2022 09:00 AM |
06-Jul-2022 12:00 PM |
06-Jul-2022 12:00 PM |
[WIDENING OF V-5 ROAD SECTOR -8 (ENTRY FROM VIGYAN PATH), CHANDIGARH. (CH. TO REVENUE HEAD)]
[ 2022_MCC_R3_037][2022_MCC_66478_2]
|
Municipal Corporation||Engineering-MCC||Road Division - I
|
8. |
30-Jun-2022 09:00 AM |
06-Jul-2022 12:00 PM |
06-Jul-2022 12:00 PM |
[P/ L Road marking paint and P/F Cat Eye, dual-directional delinator, Pedestal Crossing sign board and Five Arrow Reflective Sign Board under jurisdiction of roads SDER 5 MC Chd]
[2022/R2/22][2022_MCC_66701_1]
|
Municipal Corporation||Engineering-MCC||Road Division - I
|
9. |
29-Jun-2022 05:00 PM |
06-Jul-2022 12:00 PM |
06-Jul-2022 12:00 PM |
[RE-CARPETING OF V-3 ROAD BETWEEN SEC 37/38,38 WEST/38, 38 WEST/39 AND SEC 39/40 V-4 ROAD SEC 37,38 AND 38 WEST, V-6 ROAD SEC 40 C, AND WATER WORKS COLONY SEC 39 AND MARKET PARKING OF SEC 37 C AND D, SEC 40 D AND GREEN BLET PARKING SEC 40, CHD]
[MCC/ROADS-I/2022/04-01][2022_MCC_65467_2]
|
Municipal Corporation||Engineering-MCC||Road Division - I
|
10. |
29-Jun-2022 05:00 PM |
06-Jul-2022 12:05 PM |
06-Jul-2022 12:05 PM |
[REPLACEMENT OF OLD / BROKEN 6 INCH 160MM PVC PIPE LINE WITH 6 INCH 160MM HDPE PIPE IN PARKS OF SECTOR 46 A AND B, C AND D,CHANDIGARH UNDER THE CHARGE OF SDE MC P.H. SUB DIVISION NO.19,CHANDIGARH UNDER CAPITAL HEAD -LANDSCAPING]
[MCC/H-2/52/2022][2022_MCC_66694_1]
|
Municipal Corporation||Engineering-MCC||Horticulture Division
|